Reviews from George Poston (1)
-
Bridge comment on Dr. Sally Ride Memorial (NASA Causeway) Bridge
Comment by: George Poston on Oct 21, 2022
Vessel Type: Power
LOA: 45'
Southbound board missing. Called operator on VHF. Asked to confirm clearance was 27'. His reply: " If that's what the chart says" Not exactly professional or helpful.
-
WG Editor Comment:
Bridge tenders are not permitted to provide clearances.
View location on the Waterway Guide Explorer
-
WG Editor Comment: