Reviews from Lee Hedge (1)
-
Bridge comment on Dr. Sally Ride Memorial (NASA Causeway) Bridge
Comment by: Lee Hedge on Dec 10, 2022
Vessel Type: Power
LOA: 55'
With a 3.3 foot tied the south markers showed 23 feet of clearance. We lowered all antennas and WeatherStation and cleared it and we need 22 feet. The 27 foot indicated on the chart is a bit exaggerated.
-
WG Editor Comment:
The tide boards read low steel. There is an additional 4 feet in the center.
View location on the Waterway Guide Explorer
-
WG Editor Comment: