Reviews from Bruce Mitchel (2)
-
Bridge comment on Blackburn Point Swing Bridge
Comment by: Bruce Mitchel, LULU , on May 3, 2022
Vessel Type: Power
LOA: 38'
I understand that this bridge is now reduced from demand to operating on the top of the hour only
Good idea to communicate with bridge operator and other traffic well in advance as this bridge only has 9' vert.clearance with less than 25'width and will be a congested choke point-
WG Editor Comment:
This is a temporary schedule while repairs are underway. When repairs are completed the on demand schedule will resume.
View location on the Waterway Guide Explorer
-
WG Editor Comment:
-
Bridge comment on Blackburn Point Swing Bridge
Comment by: Bruce Mitchel, LULU , on Apr 26, 2022
Vessel Type: Power
LOA: 38'
Currently operating on the hour and half hour due to mechanical problems This was communicated to me by bridge operator on Sunday 4/24
View location on the Waterway Guide Explorer