Modal title
Modal body text goes here.
Log In
FL: Ponce Inlet, Dredging
- Date Reported: Jan 29, 2025
- Reporter: Ted Stehle
- Source: CG 7th District LNM 05-25
- Description:
General/Marine Construction (Excluding Bridges)/Dredging From: 2025-01-21 To: 2025-11-30 Location: 29.11424° N / 80.95783° W 29.07404°N / 80.91148° W 29.04162° N / 80.90393° W 28.97827° N / 80.89363° W 29.02602° N / 80.92281° W 29.11424° N / 80.95783° W GatorDredging will be dredging Ponce Inlet and connecting ICW, disposing onto Ponce Inlet Beach. Operations are expected to commence on orabout March3, 2025, with an estimated completion date of November 7, 2025. Mariners are urged to use extreme caution in the area, transit attheir slowest safe speed to minimize wake, and proceed with caution after passing arrangements have been made. Floating and submergedhigh density polyethylene (HDPE) and steel pipeline associated with the hydraulic dredging operations of the channel will be utilized. Pipeline,work vessels, dredge barge, booster pump barge(s) and buoys will be visibly lighted and marked according to coast guard regulations and willbe in the area until all work is complete and can change configuration daily. Vessels BRITTYN B and DREDGE CLEARWATER and/or equipmentwill be in multiple locations at the same time and monitor VHF-FM channel 16.
- Lat / Lon: N 29° 04.652' / W 080° 55.057'
Be the first to provide comments about this navigation alert
These are observations from the boating community. Waterway Guide information is verified regularly and all efforts will be made to validate any new updates submitted here. Thank you for taking the time to share comments about your experience.
Waterway Guide reserves the option of editing reviews and comments for grammar, clarity and the removal of defamatory or potentially slanderous language. When appropriate, reviews are forwarded to businesses for response prior to being made public. We will make every effort to be objective and impartial when posting reviews, but do not publicize details of disputes between parties.
Current Review Policies
Waterway Guide reserves the option of editing reviews and comments for grammar, clarity and the removal of defamatory or potentially slanderous language. When appropriate, reviews are forwarded to businesses for response prior to being made public. We will make every effort to be objective and impartial when posting reviews, but do not publicize details of disputes between parties.
- Comments are reviewed and/or verified by Waterway Guide staff and do not post immediately. Please use a valid email address so that we can contact you if we need clarification (email address will not be published).
- Name will be published. Anonymous comments may not be posted.
- Comments will be shared with the reviewed marina to offer them an opportunity to respond. If they choose to do so, the marina’s comments may also be posted in response to the original comment.
- Comments containing foul or obscene language will be rejected or returned for resubmission.
- Comments containing personal attacks will be rejected or returned for resubmission.
- Off-topic content will be rejected.
- Comments must describe commenter's personal experience – “hearsay” reports will be rejected.
- Comments must be understandable and clear enough to inform other boaters.
- URL links are allowed only if they inform the content – no “advertising” your business or blog.