Modal title
Modal body text goes here.
Log In
FL: Loxahatchee River, US 1 Jupiter Federal Bridge, Temporary Deviation
- Date Reported: Nov 28, 2024
- Reporter: Ted Stehle
- Source: CG 7th District LNM 0748/24
- Description:
General/Bridges/Temp Deviation From: 2024-11-21 To: 2025-04-01 Location: 26.94755° N / 80.08495° W Bridge Name: US1 Jupiter Federal Bridge From 8 a.m. to 6 p.m. on Monday December 9, 2024, the main channel and temporary channel will be fully obstructed. At 6 p.m. the main channel will be open to navigation and the temporary channel will be disestablished. From 6 p.m. on Monday, December 9, 2024, through 8 a.m. on Monday, March 31, 2025, the US1 Jupiter Federal Bridge will be locked in the open/up position or will provide single-leaf openings on signal/demand. A full opening will not be provided. During this temporary deviation, new horizontal clearance through the structure is 125ft. The main channel will be partially obstructed, approximately 60ft of horizontal clearance will be available for marine traffic. The vertical clearance through the unobstructed span will be 38ft at low steel and 42ft at the center in the closed/down position and 100ft in the open/up position.
- Lat / Lon: N 26° 56.850' / W 080° 05.124'
Be the first to provide comments about this navigation alert
These are observations from the boating community. Waterway Guide information is verified regularly and all efforts will be made to validate any new updates submitted here. Thank you for taking the time to share comments about your experience.
Waterway Guide reserves the option of editing reviews and comments for grammar, clarity and the removal of defamatory or potentially slanderous language. When appropriate, reviews are forwarded to businesses for response prior to being made public. We will make every effort to be objective and impartial when posting reviews, but do not publicize details of disputes between parties.
Current Review Policies
Waterway Guide reserves the option of editing reviews and comments for grammar, clarity and the removal of defamatory or potentially slanderous language. When appropriate, reviews are forwarded to businesses for response prior to being made public. We will make every effort to be objective and impartial when posting reviews, but do not publicize details of disputes between parties.
- Comments are reviewed and/or verified by Waterway Guide staff and do not post immediately. Please use a valid email address so that we can contact you if we need clarification (email address will not be published).
- Name will be published. Anonymous comments may not be posted.
- Comments will be shared with the reviewed marina to offer them an opportunity to respond. If they choose to do so, the marina’s comments may also be posted in response to the original comment.
- Comments containing foul or obscene language will be rejected or returned for resubmission.
- Comments containing personal attacks will be rejected or returned for resubmission.
- Off-topic content will be rejected.
- Comments must describe commenter's personal experience – “hearsay” reports will be rejected.
- Comments must be understandable and clear enough to inform other boaters.
- URL links are allowed only if they inform the content – no “advertising” your business or blog.