Modal title
Modal body text goes here.
Log In
MD: Potomac River, Harry W. Nice Bridge, speed restrictions due to construction
- Date Reported: Feb 23, 2022
- Reporter: Ted Stehle
- Source: CG 5th District LNM 0508/22
- Description:
Bridge replacement operations are scheduled to continue adjacent to the Federal Navigation Channel at the New Harry W. Nice / Thomas “Mac” Middleton (US 301) Bridge on the Potomac River in Newburg, MD through November 2024. A new 6-knot speed limit is now being enforced for 0.5 nautical miles north and south of the bridge. Wakes from speeding boats can create major hazards for construction operations and workers.
Mariners are reminded to heed the speed limit markers established by the State of Maryland when transiting the area, so that wake does not affect the platforms and barges at the work site. For more information, visit www.nicemiddletonbridge.com or call 888-994-1415. - Lat / Lon: N 38° 21.921' / W 076° 59.547'
2 Boater Comments
These are observations from the boating community. Waterway Guide information is verified regularly and all efforts will be made to validate any new updates submitted here. Thank you for taking the time to share comments about your experience.
Waterway Guide reserves the option of editing reviews and comments for grammar, clarity and the removal of defamatory or potentially slanderous language. When appropriate, reviews are forwarded to businesses for response prior to being made public. We will make every effort to be objective and impartial when posting reviews, but do not publicize details of disputes between parties.
Current Review Policies
Waterway Guide reserves the option of editing reviews and comments for grammar, clarity and the removal of defamatory or potentially slanderous language. When appropriate, reviews are forwarded to businesses for response prior to being made public. We will make every effort to be objective and impartial when posting reviews, but do not publicize details of disputes between parties.
- Comments are reviewed and/or verified by Waterway Guide staff and do not post immediately. Please use a valid email address so that we can contact you if we need clarification (email address will not be published).
- Name will be published. Anonymous comments may not be posted.
- Comments will be shared with the reviewed marina to offer them an opportunity to respond. If they choose to do so, the marina’s comments may also be posted in response to the original comment.
- Comments containing foul or obscene language will be rejected or returned for resubmission.
- Comments containing personal attacks will be rejected or returned for resubmission.
- Off-topic content will be rejected.
- Comments must describe commenter's personal experience – “hearsay” reports will be rejected.
- Comments must be understandable and clear enough to inform other boaters.
- URL links are allowed only if they inform the content – no “advertising” your business or blog.
-
Comment by: Donna Wallace, Adelante, on May 20, 2024
Vessel Type: Sail
LOA: 38'
Draft: 5.4'Construction must be completed. Saw no equipment near bridge and no posted speed limit.
-
WG Editor Comment:
The alert is still listed in the 5th District LNM week 20/24 dated May 14, 2024.
View location on the Waterway Guide Explorer
-
WG Editor Comment:
-
Comment by: Capt. Mac Rubel on Sep 24, 2022
LOA: 48'
Draft: 5.0'Contact Bridge Construction Operations on Channel 10.
View location on the Waterway Guide Explorer