Waterway Guide Logo
  • SUBSCRIBE
  • Explore
    • Explorer
    • Destinations
    • Marinas
      • Map
      • Directory
    • Services
      • Map
      • Directory
    • Anchorages & Free Docks
      • Map
      • Directory
    • Bridges & Locks
      • Map
      • Directory
    • Navigation Alerts
      • Map
      • Directory
    • Fuel
      • Diesel
      • Gas
      • Fuel Price List
  • Download The App
  • Destinations
  • Knowledge Center
  • Ship Store
    • Ship Store Home
    • Great Lakes Volume 1
    • Great Lakes Volume 2
    • Northern
    • Chesapeake Bay
    • Mid-Atlantic
    • Southern & Gulf Coast
    • Bahamas
    • Cuba
    • Caribbean
  • Urgent Alerts Urgent Alerts
  • Forgot Password?
    Or log in with:
    facebook
    apple
Modal title

Modal body text goes here.

Log In
Forgot Password?
Or log in with:
facebook
apple

Thanks for your valuable feedback!
Back to the Waterway Explorer

View in Waterway Explorer

Florida East Coast Railroad Bridge

  • Mile Marker: 2.5
  • Lat / Lon: N 26° 07.113' / W 080° 08.724'
  • Bridge Type: Bascule
  • Vertical Clearance (Closed): 4.00 ft.
  • Horizontal Clearance: 60.00 ft.
  • Schedule:

    (c) The draw of the Florida East Coast (FEC) Railroad Bridge across the New River, mile 2.5, at Fort Lauderdale shall operate as follows:

    (1) The drawbridge shall be maintained in the fully open-to-navigation position for vessels at all times, except during periods when it is closed for the passage of rail traffic, inspections, and to perform periodic maintenance authorized in accordance with subpart A of this part.

    (2) The drawbridge shall not be closed to navigation for more than 60 consecutive minutes.

    (3) Notwithstanding paragraph (c)(1) of this section, the drawbridge shall open and remain open to navigation for a fixed 10-minute period each hour from 5 a.m. to 11:59 p.m., except that the drawbridge shall be open at the following times which shall serve as the hourly fixed 10-minute period:

     

    Table 1 to Paragraph (c)(3)

      7:00 a.m. until 7:10 a.m. 9:00 a.m. until 9:10 a.m. 4:00 p.m. until 4:10 p.m. 6:00 p.m. until 6:10 p.m. 10:00 p.m. until 10:10 p.m.

    (i) Additionally, in each hour from 12:00 p.m. to 2:59 p.m., the drawbridge shall open and remain open to navigation for an additional 10-minute period.

    (ii) The 10-minute opening periods shall be published on a quarterly basis by the drawbridge owner and reflected on the drawbridge owner's website and mobile application.

    (4) The drawbridge shall have a drawbridge tender onsite at all times who is capable of physically tending and operating the drawbridge by local control, if necessary, or when ordered by the Coast Guard.

    (i) The drawbridge tender shall provide estimated times of drawbridge openings and closures, upon request.

    (ii) Operational information will be provided 24 hours a day on VHF-FM channels 9 and 16 or by telephone at (305) 889-5572. Signs shall be posted visible to marine traffic and displaying VHF radio contact information, website and application information, and the telephone number for the bridge tender.

    (5) In the event of a drawbridge operational failure, or other emergency circumstances impacting normal drawbridge operations, the drawbridge owner shall immediately notify the Coast Guard Captain of the Port Miami and provide an estimated time of repair and return to normal operations.

    (6) A drawbridge log shall be maintained including drawbridge opening and closing times. The drawbridge log should include reasons for those drawbridge closings that interfere with scheduled openings in this section. This drawbridge log shall be maintained by the drawbridge owner and upon request, be provided to the Coast Guard.

    (7) A website and mobile application shall be maintained by the drawbridge owner and publish:

    (i) Drawbridge opening times required by this paragraph (c);

    (ii) Timely updates to schedules; including but not limited to impacts due to emergency circumstances, repairs, and inspections;

    (iii) At least 24-hour advance notice for each schedule in order to facilitate planning by maritime operators; and

    (iv) To the extent reasonably practicable, at least 60-minutes advance notice of schedule changes or delays.

    (8) The drawbridge shall display the following lights:

    (i) When the drawbridge is in the fully open position, green lights shall be displayed to indicate that vessels may pass.

    (ii) When rail traffic approaches the block signal, the lights shall go to flashing red, then the drawbridge lowers and locks, and the lights shall remain flashing red.

    (iii) After the rail traffic has cleared the drawbridge, the drawbridge shall open and the lights return to green.

    Editor's Note: Bridge schedules are subject to temporary change due to repairs, maintenance, events, etc. Check the Waterway Explorer for possible nav alerts.

  • VHF Channel: 09
  • Phone: 305-889-5572

DISCLAIMER: Bridge heights and clearances are published from sources and records provided by various state and federal entities. Waterway Guide Media does not warrant the information as accurate. Water depth, placement of on-location signage and other variables may impact published horizontal and vertical clearances. Exercise caution when transiting.


Be the first to provide comments about this bridge

These are observations from the boating community. Waterway Guide information is verified regularly and all efforts will be made to validate any new updates submitted here. Thank you for taking the time to share comments about your experience.

Waterway Guide reserves the option of editing reviews and comments for grammar, clarity and the removal of defamatory or potentially slanderous language. When appropriate, reviews are forwarded to businesses for response prior to being made public. We will make every effort to be objective and impartial when posting reviews, but do not publicize details of disputes between parties.

Current Review Policies

Waterway Guide reserves the option of editing reviews and comments for grammar, clarity and the removal of defamatory or potentially slanderous language. When appropriate, reviews are forwarded to businesses for response prior to being made public. We will make every effort to be objective and impartial when posting reviews, but do not publicize details of disputes between parties.

  • Comments are reviewed and/or verified by Waterway Guide staff and do not post immediately. Please use a valid email address so that we can contact you if we need clarification (email address will not be published).
  • Name will be published. Anonymous comments may not be posted.
  • Comments will be shared with the reviewed marina to offer them an opportunity to respond. If they choose to do so, the marina’s comments may also be posted in response to the original comment.
  • Comments containing foul or obscene language will be rejected or returned for resubmission.
  • Comments containing personal attacks will be rejected or returned for resubmission.
  • Off-topic content will be rejected.
  • Comments must describe commenter's personal experience – “hearsay” reports will be rejected.
  • Comments must be understandable and clear enough to inform other boaters.
  • URL links are allowed only if they inform the content – no “advertising” your business or blog.

Comment on this Bridge

The name field is required.

The email field is required.

  Display?

LOA is required.

Draft is required.


Yes, sign me up for the News & Navigation Alerts.

Sending...

Review Policies
  • Explorer
  • Download The App
  • Destinations
  • Knowledge Center
  • Shop
Popular Resources
Fuel Price Reports
View the Directory
Subscribe To Our Newsletter
logo
About Us
Contact
Advertise
Careers
Legal
Marina Login
© 2025 Waterway Guide Media LLC: All rights reserved. No part of this site may be reproduced without written permission.
Waterway Guide is proud to be a sponsor of:
aglca
mtoa
seven-seas
us-sailing
abm
Apple Sign-In
Note: If you already have a Waterway Guide account please choose, when prompted, to share your email with us so we can sign you in to your proper account.
 Sign in with Apple
Newsletter Sign-Up

"No man is an ," but land surrounded by water certainly is.

The captcha question was answered incorrectly.

The email is invalid. Please close the modal window and try again.

Signing-up...