Modal title
Modal body text goes here.
Log In
Wantagh Parkway Bridge
- Lat / Lon: N 40° 36.855' / W 073° 30.046'
- Bridge Type: Bascule
- Vertical Clearance (Closed): 20.00 ft.
- Horizontal Clearance: 76.00 ft.
- Schedule:
The draw shall open on signal after at least a half-hour advance notice is given by calling the number posted at the bridge. From 6:30 a.m. through 12 noon and from 12:15 p.m. through 4 p.m., Monday through Friday, one bascule lift span may remain in the closed position. A full two lift span opening shall be given between 12 noon and 12:15 p.m. provided at least a one-hour advance notice is given by calling the number posted at the bridge.From 7:30 a.m. through 8:30 p.m. on Saturday, Sunday and Federal holidays the draw shall open on the hour and half-hour provided at least a half-hour advance notice is given by calling the number posted at the bridge.
Editor's Note: Bridge schedules are subject to temporary change due to repairs, maintenance, events, etc. Check the Waterway Explorer for possible nav alerts. - VHF Channel: 13
- Phone: 631-952-6777
1 Boater Comment
These are observations from the boating community. Waterway Guide information is verified regularly and all efforts will be made to validate any new updates submitted here. Thank you for taking the time to share comments about your experience.
Waterway Guide reserves the option of editing reviews and comments for grammar, clarity and the removal of defamatory or potentially slanderous language. When appropriate, reviews are forwarded to businesses for response prior to being made public. We will make every effort to be objective and impartial when posting reviews, but do not publicize details of disputes between parties.
Current Review Policies
Waterway Guide reserves the option of editing reviews and comments for grammar, clarity and the removal of defamatory or potentially slanderous language. When appropriate, reviews are forwarded to businesses for response prior to being made public. We will make every effort to be objective and impartial when posting reviews, but do not publicize details of disputes between parties.
- Comments are reviewed and/or verified by Waterway Guide staff and do not post immediately. Please use a valid email address so that we can contact you if we need clarification (email address will not be published).
- Name will be published. Anonymous comments may not be posted.
- Comments will be shared with the reviewed marina to offer them an opportunity to respond. If they choose to do so, the marina’s comments may also be posted in response to the original comment.
- Comments containing foul or obscene language will be rejected or returned for resubmission.
- Comments containing personal attacks will be rejected or returned for resubmission.
- Off-topic content will be rejected.
- Comments must describe commenter's personal experience – “hearsay” reports will be rejected.
- Comments must be understandable and clear enough to inform other boaters.
- URL links are allowed only if they inform the content – no “advertising” your business or blog.
-
Comment by: James Conlon on May 8, 2019
Vessel Type: Power
LOA: 40'
Draft: 4.0'Clearance at high tide.
-
WG Editor Comment:
All bridge vertical clearances shown in Explorer are at MHW.
View location on the Waterway Guide Explorer
-
WG Editor Comment: